Project: Broome Terminal Gantry and Electrical Upgrade
Scope: Construction of new bottom load gantry and electrical systems around existing and operational top load gantry, installation included new pumping systems, new MCC, new solenoid  valves, new server room racking and UPS and control systems. Tie in of existing systems to new systems during shut down. Finally removal of redundant wiring and pumps from redundant gantry. Hazardous Area install was required due to being in an environment with ULP, PULP, Diesel, and JETA1 fuels being stored and loaded.