BASF Hutt Lagoon Heat Trace Upgrade

Client: BASF Project Value: $60,000.00 Enerlinks Contact Value: $22,000.00 Date: October 2021 Enerlink were selected by BASF to complete the electrical installation component of their Heat Trace upgrade project at their Hutt Lagoon production facility south of Kalbarri, WA. Enerlinks scope included the decommissioning of existing heating pads, installation and commissioning of new heat trace circuits along with […]

Read More…


Mondium Western Turner Phase 2 Contractor Refuel Facility

Client: Mondium Project Value: $450M Date: July, 2020 Enerlink were approached be Mondium to assist in the final installation, statutory inspections, commissioning and sign-off of their contractor refuel facility. The refuel facility has a capacity of some 200,000L of diesel for the use by contractors working on the Rio Tinto Western Turner Phase 2 expansion […]

Read More…


APA HBI Gas Inlet/Metering Station

Client: Primero Group & APA Group Project Value: $50,000.00 Enerlinks Contact Value: $23,000.00 Date: November 2018 Enerlink were tasked with the project management, EI&C installation and commissioning assistance for APA Group’s HBI Gas Inlet/Metering Station in Port Hedland. The project involved the replacement of piping spools, upgrade of instruments, replacement of cabling and an upgrade of the PLC […]

Read More…


JKC

Project: Inpex Ichthys Onshore Gas Processing Plant. Scope: EI&C installation for Train 1. Included underground reticulation, cable ladder installations, reticulation of all above ground cabling, terminations, tie ins between modules and tie ins to sub-stations. Whole of installation was for compliance to Hazardous Area. […]

Read More…


BP Australia

Project: Broome Terminal Gantry and Electrical Upgrade Scope: Construction of new bottom load gantry and electrical systems around existing and operational top load gantry, installation included new pumping systems, new MCC, new solenoid  valves, new server room racking and UPS and control systems. Tie in of existing systems to new systems during shut down. Finally removal of […]

Read More…

Event Preview

KBR

Project: Rio Tinto Hope Downs 4 Scope: NPI, Including administration, warehouse, LV/HV Tyre Maintenance, LV/HV Maintenance Workshop, Bull Oil and Lubricant, Diesel Fuel Farm and Ammonium Nitrate/Emulsion Stores. Scope included LV reticulation to all buildings along common services trench, LV install to all buildings, LV feeders from facility transformer to MCC, commissioning and handover. […]

Read More…